Poultry Breeding Steel Cow Farm Shed Building Structure

Poultry Breeding Steel Cow Farm Shed Building Structure is a kind of Steel structure building. The main steel frame is formed by linking up H-section, Z-section and U-section steel components while roof and wall using a variety of sandwich panels. Usage: steel cow shed building structure, poultry farm shed, poultry farm structure, poultry breeding farm, poultry farm building, farm shed

Product Details

Director Group Co., Ltd. is a China based manufacturer of steel structure building, prefabricated house and related steel products. Our products include the prefabricated house, steel structure building, container house, modular house, light steel villa, sandwich panels, and profiled steel, etc. The products are commonly used in the industrial and civil construction, and commercial industries for construction of temporary accommodation, warehouses, workshops, and other related buildings. We have exported our products to over 40 different countries around the world.

We are an ISO9001 registered company, and we produce the products in Chinese National Standard, international standard, and customer’s special request.

DFX have supplied prefab poultry house to Algeria, Phillippines, Ghana, Venuzuela, Australia.

The poultry farm shed can be layer chicken house, broiler chicken house.


Item Name

poultry breeding farm shed building structure

Main Material

Q235/Q345 Welded H Beam and Hot Rolled Section Steel

Surface

Painted or Hot Dip Galvanized

Roof & Wall Panel

Sandwich Panel/Single Corrugated Steel Sheet/Color

Sheet with Glass-wool, or Customers selection

Windows&Doors

PVC or Aluminum-alloy and windows. Windows and doors

standard poultry shed size120x12x2.5m
feeding quantiy per sem10-12 for broiler ground chicken
control room5mx3m
dog house13mx2.5m
Venlationcooling pad, fans
life of servicemore than 50 years


Poultry Breeding Steel Cow Farm Shed Building Structure is a kind of Steel structure building. The main steel frame is formed by linking up H-section, Z-section and U-section steel components while roof and wall using a variety of sandwich panels. 


You may give us your own drawings to enable us construct as per your request or you might just give us your ideas, we can design the project based on your ideas. Welcome to contact us for anything you needed! 


Design Code

"Steel Design Code" (GB50017-2003)

"Cold-formed steel structure technical specifications" (GB50018-2002)

"Construction Quality Acceptance of Steel" (GB50205-2001)

"Technical Specification for welded steel structure" (JGJ81-2002, J218-2002)

"Technical Specification for Steel Structures of Tall Buildings" (JGJ99-98)  


Construction Advantage

1. Possesses a wide span, with either a single or multiple spans and can have a maximum span clearance distance in 36m without middle columns.

2. Low cost with unit price ranging from USD35 to USD70 per square meter FOB according to customer's requirements

3. Fast construction and easy installation

4. Has a service life of more than 50 years

5. The warehouses are also environmentally friendly, have a stable structure, are earthquake resistance, water proof, and energy saving.


Main materials:

1.  Q235, Q345 H section steel structure for columns and beam

2.  Pre-embedding anchor bolts for connection columns to foundation

3.  Intensive bolts for connection between columns and beams

4.  Wall/roof panel: one layer corrugated steel plate or sandwich panels

5.  Windows/doors, PVC, aluminum alloy, steel, etc.


Connection Method

The columns are connected with the foundation by pre-embedding anchor bolt

The beams and columns, beams and beams are connected with high intensity bolts 


WASTE DISPOSAL

WHAT ARE FARMERS’ LEGAL RESPONSIBILITIES?

The inappropriate disposal of farm wastes may be an offence under the Environment Protection Act, or contravene a local municipal law.

Publications issued by the relative authorities have been produced as a guide for the management of wastes on your farm. It does not provide an exhaustive list of waste types and management options available. If you are unsure about the appropriate management options for your wastes, contact your local council or EPA office or the related authorities for more information.


WHY IS WASTE MANAGEMENT AN ISSUE?

‘Clean and green’ agriculture is of increasing importance in the marketing of Australian produce, both domestically and overseas. Appropriate management of farm wastes can benefit your farm by preventing: contamination impacting property value contamination of the land and water on your farm breeding sites for disease spreading mosquitos, pest animals and predators contamination of produce stock injury, disease or death offensive odours large penalties and clean-up costs from poor waste management.Access to alternative disposal and recycling programs now provides farmers with more options for dealing with their waste.


Why it is so important:

1. Environment need to keep clean for the future generations

2. To have economic benefits for long term and the sustainability of the project, farm should be in a disease free environment. Therefore, waste removal is very important to keep the expected

sanitation, wwhich directly and indirectly help you to operate your breeder farm hassles free in long run.

Before: Inappropriate waste disposal on a farm which poses a risk to stock, people and the environment.

After: Cleared area ready for revegetation


Need Quotation lists?

1. Data for design

*Wind speed (KM/H)
*Snow load (KG/M2)

*Rain load (KG/M2)
*Earthquake load if have
*Demands for doors and windows

2. Material quality

*Windows and doors quantity, size and location

*Roof and wall material, sandwich panel or corrugated steel sheet (steel sheet can not heat insulation)

3. Type

*size-- width, length, eave height and roof slope

*single slope or double slope

*single floor, double floor or multi floor

FAQ:

1. How to buy your idea products?

A:TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.

2. What is the delivery time?

A:It depends on order quantities.Generally speaking,the delivery time will be within 25 to 30 days.

3. How to pack the products?

A:We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

4. How to install after the goods arriving destination?

A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.


Quality Control

Our Package

Our Customers


Related Products
Feedback