Steel Structure Metal Shed Materials

With wide experience and expertise, DIRECTOR develops, manufactures, and trades the best quality steel structure metal shed materials. As one of the leading suppliers in this field, we can offer you a competitive price. Now, please rest assured to buy our products which is high in quality, strong in durability and reliable in stability.

Product Details

China Best Suppliers Metal Steel Structure Materials Shed

 

  Metal Steel Structure Materials Shed is a new type of light steel structure building system formed from a main steel framework comprised of H section,Z section and U section steel components,the roof and walls utilizing a variety of panels and other components such as windows,doors,and cranes.The light steel structure building is widely used in the construction of buildings such as warehouses,workshops,large factories,poultry feeding buildings,hangar,ect.

 We has been specialing in supplying the customized steel structure. You can give us your detailed discription about the shed you need, our engineer can design according to the information you give us. 

Place of Origin:

Shandong, China (Mainland)

Type:

light steel structure

Certification:

ISO 9001:2008, CE/COC/ certificate when request

Service life:

more than 50 years

Delivery Detail:

30 days after received deposit and drawing confirmed

Packaging Details:

(1)Packing the pipes into the bundles by the steel strip

(2)Packing steel columns ends\beams ends,plates by the blanket

(3)Packing the small parts by bags,EPS foam or box

(4)To make the loading and unloading more efficiently and saving the delivery cost,40'OT is preferred to loading the steel building erection.

(5)We also could pack according to customer's requirement.

MOQ:

1 Set

Supply Ability:

60000 Square Meter Per Month, 1000 ton/month

Port:

Qingdao port, China

Payment Terms:

T/T,L/C,Western Union


China Best Suppliers Metal Steel Structure Materials Shed Main Component

1. Main Structure: Steel Welded H Section
2. Purlin: C Section Steel or Z Section Steel
3. Roof Cladding: Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil
4. Wall Cladding: Sandwich Panel or Corrugated Steel Sheet
5. Tie Rod: Circular Steel Tube
6. Brace: Round Bar
7. Column & Transverse Brace: Angle Steel or H Section Steel or Steel Pipe
8. Knee Brace: Angle Steel
9. Wrapping Cover:Color Steel Sheet
10. Wall and Roof insulation: Single colour sheet, Colour sheet with Glass-wool, EPS Sandwich panel
11. Roof Gutter: Color Steel Sheet
12. Rainspout: PVC Pipe
13. Door: Sliding Door, use 50mm EPS Sandwich panel
14. Windows: PVC/Plastic Steel/Aluminum Alloy Window
15. Connecting: High Strength Bolts


 Construction Shed Advantage

· 1. high strength

· 2. Could be moved and recycle.

· 3. Could be designed according to different purpose and environment condition

· 4. Steel structures can be erected speedily.

· 5. Cost Savings in a Competitive Market

· 6. Long life span, could be more than 50 years


Production Line

Package and Loading 

FAQ

1.Common type of the industrial building?

Reply:Portal frame is the usual type in the industrial workshop and warehouse shed.Other types also could be designed and manufacturer as per clients'  request.

2.What’s the quality grade of the steel structure components?

Reply:Q345 is used for main steel structure,Q235 is used for secondary steel structure.

3.How about the delivery time?

Reply:Usually,within 25-60 days after the order confirmed,also depends on the fabrication quantity.

4.How about the derust grade?

Reply:Ball blasting Sa2.5 on main steel structure manual derust St2.0 on secondary steel structure.

5.What kind panel used for the roof and wall?

Reply: Color corrugated steel sheet and sandwich panel could be used.Sandwich panel

performs well on the heat insulation,sound insulation.Common sandwich materials are EPS,glass wool and PU.

6.How to install it?

Reply: We will furnish you the detailed construction drawing and the construction 

manual which could help you to erect and install the building step by step.We also could sendthe engineer your local to help you if needed.

7.Maintenance:

Reply:Finish paint need be done after the frame installed,and do it again after 6-8 months.So the surface will stay m ore time.


Contact Us 

Company Name:Director Co.,Ltd

Qingdao Director Steel Structure Co.,Ltd

Add:Room 1102, Unit A, No.1 Building, Haili Plaza, No. 917, Tongan Road, Qingdao, China

Web: www.bigdirector.com; www.directorgroup.com.cn 

Contact Person:Alison Zhang

Tel: 0086-532-66716752  

Fax: 0086-532-66710826Light china prefab steel structure frame houses for sale

E-mailinfo(at)bigdirector.com

<span style="margin: 0px; padding: 0px; border: 0px; font-style: inherit; fo

Related Products
Feedback