Steel Structure Building

Home > Products > Steel Structure > Steel Structure Building

Pre Engineered Metal Structure Portable Steel Frame House Buildings

Pre Engineered Metal Structure Portable Steel Frame House Buildings

About us Our company has designed and manufactured steel buildings for 20 years. With professional design, good quality, competitive price, we have customers in 40 countries in the world. Please contact us for low price of Pre engineered Metal Building, portable steel buildings. Pre Engineered...

Product Details

About us

Our company has designed and manufactured steel buildings for 20 years.

With professional design, good quality, competitive price, we have customers in 40 countries in the world.

Please contact us for low price of Pre engineered Metal Building, portable steel buildings.

Pre Engineered Metal Structure Portable Steel Frame House Buildings

Place of Origin:

Shandong, China (Mainland)

Service life:

More than 50 years

Certificate:

ISO 9001:2008, CE/COC/ certificate when request

Steel Surface:

Painted or galvanized steel buildings

Cargo Ready Time:

20-40 days after received deposit and drawing confirmed

Packaging Details:

Steel frames flat packed in container,sheeting packed by paper,fittings in cartons or bags

MOQ:

1 Set steel frame buildings

Supply Ability:

60000 SQM/month, 1000 ton/month

Port:

Qingdao Port, China

Payment Terms:

T/T,L/C,Western Union

Performance

Fast construction and easy installation,earthquake resistance,recyclable

Type:

metal structure building

Building Construction Main Components

1

main steel frame:

Q235 Q345 steel H beam and comlumns,painted or galvanized,box steel,galvanized C section or steel pipe

2.

Secondary frame :

galvanized C or Z purlin,steel bracing,tie bar,knee brace,flashing etc.

3.

Roof panel:

EPS sandwich panel,glass fiber sandwich panel,rock wool sandwich panel,and Pu sandwich panel or steel sheet

4 .

Wall panel:

Sandwich Panel or Corrugated Steel Sheet

5.

Roof Gutter:

Color Steel Sheet or Galvalume sheet

6.

Rainspout:

PVC Pipe

7.

Door:

Sliding Sandwich Panel Door Or Roller Door

8.

Windows:

PVC or Aluminum Alloy Window

9.

Connecting:

Anchor bolts, intensive bolt,galvanized machine bolt,self-drilling screws

H Section Steel Production Course

Steel Parts Quality Control

Steel House Building Finished Main Steel Parts

Main Fittings and Accessory

Package and Container Loading

Connection Method

The columns are connected with the foundation by pre-embedding anchor bolts.

Beams and columns, beams and beams are connected with high intensive bolts.

Roof and wall panel to be fixed on purlin with self tapping screws.

General Installation Tools For Reference

Our Services

Produce:

1.Production job based on steel building confirmed drawing.

2.We also can make the products with materials and drawing from customer.

3.Quality control work goes through every step during production.

4.Third Party Quality Check,customer on-site quality inspection and any other reasonable inspection way is ok.

After-sale service:

1.After production, we will supply steel structure installation drawing.

2.Send techinican to guide installation on site if customer request.

3.After years, building cladding need to be moved away.We will offer materials that need re-new.

4.If you have a building, not made by us,we can help check the strength of the building.

Additional service:

1.If you have something need to be sent together.We can arrange loading container.

2.If need us help to buy other products,we can help source and buy for you.

3.If need us check the other factory real or not,or need us inspect the container loading,we can help free.

4.When you to come to China for short travel, you need the language, hotel booking service. we would like help.



Related Products
Feedback